PROJECT ROADMAP

Know who does what before the order starts.

A capsule house is one part of a project. Product configuration, export delivery, local approvals, foundation, crane access and utility connections must be defined as a single written scope.

E7 capsule house reference layout and features
Reference layouts guide discussion; signed drawings and specifications define the order.
BRIEF TO HANDOVER

Eight stages with fewer surprises.

Timing is estimated, not guaranteed. The signed order, production schedule, route, sailing, customs and site conditions control the final timetable.

01

Project brief

Use, model, quantity, destination, target date, climate, road and crane access.

02

Model and scope

Confirm standard configuration, options, layout, finish and items that need separate local work.

03

Written quotation

Reference product price becomes a written commercial scope with destination and exclusions.

04

Contract confirmation

Dimensions, drawings, specification, payment stages and responsibilities are confirmed in writing.

05

Production

Normally estimated at 45–60 days, subject to the signed order and specification.

06

Inspection and packing

Complete the agreed quality checks and shipping preparation before dispatch.

07

International transit

About 30 days as a route-dependent reference; port, sailing and customs can change it.

08

Local works and handover

Foundation, crane, utility connections, local installation and approvals follow the agreed responsibility plan.

HAOZAILAI written scope

  • Model and agreed product configuration
  • Production specification and agreed drawings
  • Factory production and agreed inspection evidence
  • Export packaging and documents listed in the quotation
  • Shipping arrangement only when included in writing
  • Remote technical coordination listed in the contract

Buyer and qualified local parties

  • Land, planning, building, fire and operating approvals
  • Site survey, access route and crane position
  • Foundation designed for local conditions
  • Import, customs, taxes and duties unless quoted otherwise
  • Crane, installation and utility connections unless included
  • Local inspection, occupancy and business requirements
PRICE BOUNDARY

What the website price means.

The public amount helps compare models; it is not a delivered project total.

Reference ex-factory product price

Used to compare the website’s eight products and their stated configuration basis.

  • Model-level reference price
  • Standard or project-specific configuration discussion
  • Final inclusions confirmed in the signed specification
  • Final commercial amount confirmed in the written quotation

Separate unless included in writing

These project costs depend on destination, route and site conditions.

  • International shipping
  • Tax, duty and customs charges
  • Foundation and site preparation
  • Lifting, crane work and local installation
  • Water, drainage and electrical connections
  • Local permits and approvals
BEFORE REQUESTING A QUOTE

Prepare six useful facts.

01 · PURPOSE

Use and occupancy

Hotel, resort, private guest space, workforce accommodation or another project use.

02 · PRODUCT

Model and quantity

Choose a model or ask for a recommendation based on target area and capacity.

03 · DESTINATION

Country, city and port

The delivery route cannot be scoped without a real destination.

04 · SITE

Road and crane access

Share photos, access width, turning limits and any known lifting constraints.

05 · LOCAL WORK

Foundation and utilities

Confirm which qualified local parties will handle site design and connections.

06 · TIMING

Target delivery month

Allow for specification, production, shipping, customs and local readiness.